项目管理策略在XY公司STT电力工程项目中应用

伴随着中国经济快速发展,电力发展步伐不断加快,中国电网也得到迅速发展。目前电网建设已成为我国电力建设的主要方向,电网建设前景诱人。随着电力体制革新的不断深化,越来越多的电力建设工程项目推向市场。因此,加强电力建设工程中的项目管理,对于提高电力工程项目管理水平,保证施工质量、施工进度、施工安全,提升电建企业市场竞争力具有重要的理论和现实意义。本文以XY公司STT电力建设工程为研究对象,在理论研究和浅析浅析的基础上,运用项目管理和电力建设工程相关理论,结合电力建设工程的特点,对项目管理策略在电力建设工程中的具体应用作了深入浅析浅析。并对项目管理策略在STT电力建设工程的进度制约、质量制约、安全制约等三个重要环节,通过具体工程对项目管理策略的有效性作了实证研究,体现规范研究和实证研究的结合。本文将项目管理理论及策略应用到具体电力建设工程项目当中,提出了适合目前供电公司内部电力建设项目组织结构、开发流程及工作分解结构(WBS);提出并浅析浅析当前供电公司内部电力建设工程项目中存在的主要不足及产生根源;通过STT电力建设工程浅析浅析、归纳总结,最后提出了针对供电公司内部电力建设项目的对策倡议。

【Abstract】wWw.shuoshilunwen.com With China’s rapid economic development, the pace of power development accelerates, and also the state Grid has been developing rapidly. Currently Power grid construction has become the main direction of electric power construction, and the future is enticing. As the power system continuously deepens, more and more Power construction projects go into the market. Therefore, strengthening the management on project in Power construction projects has important theoretical and practical significance in elevating the level of the power project management; in guaranteeing constructive quality, constructive process and construction safety; in advancing the competence of the enterprises in the network construction market.The thesis thoroughly analyzed the project management methods applied on electric construction project, which regarded the STT electric power engineering construction project of XY Company as the research object, on the basis of theoretic studying and analyzing, applied relative principles of project management and electric power engineering construction project, and combined the characteristics of electric power engineering. Besides, through concrete program, it also did research on the efficiency of project management which on the progress control, the quality control, the security control of STT power construction project, representing the combination of canonical research and practical research.In this thesis, project management theory and methods will be applied to the specific power construction projects, proposed electrical construction projects which are suitable for the current company structure、development process and work breakdown structure (WBS).At the same time, it also proposes and analyzed the current supply of power construction company among the problems of the project and production causes; through the analysis about STT power construction, summarize, it presents strategies for the current problem of power construction projects.

【关键词】 电力建设;进度制约;质量制约;安全制约;
【Key words】 Electric power construction;The progress control;The quality control;The security control;

相关论文

电力建设项目成本制约与管理策略探析

摘要:在电力建设项目中,加强对项目成本的制约及管理,一个是可以降低造价成本,另一个是在某种作用上来说可以提升电力建设项目的施工质量。
浏览量:8846 点赞量:3867

挣值管理策略在某房地产项期工程中运用

摘要:挣值管理是一种以客观的态度来衡量项目绩效和进度的项目管理技术。由于挣值管理能够把范围、时间、成本三个变量结合在一个集成系统中。
浏览量:60292 点赞量:14442